PROJECT OVERVIEW

Town of Pendleton | Water

PENDLETON, IN—BLN has been working with the Town of Pendleton, IN for many years on various water system improvement projects. These projects began with a comprehensive waterworks analysis and study with computer modeling that recommended reinforcements to the water mains. As a result of this study, numerous projects were recommended and susbsequently completed.

These projects include renovations to the existing water treatment plant, the extension of existing water mains, a new 500,000 gallon elevated water storage tank, the design of four miles of water transmission main, system-wide water distribution improvements, several distribution system expansions, and a water supply and distribution study to supply water to the State Penitentiary.

PENDLETON IMPROVEMENTS

pendleton water tower

UNIQUE PROJECT ASPECTS

"BLN has worked with the Town on multiple different projects, from studies to renovations to the existing water treatment plant."

Client: Town of Pendleton

In-House Services Included

  • Environmental Engineering
  • Survey
  • Construction Inspection